Blog
Product notes that stay close to the contract.
Canonical Markdown posts are validated at build time and rendered as static pages, so the site stays easy to write and cheap to serve.
Engineering note2026-05-23
Pressure-testing Ota on Supabase: from setup prose to executable repo readiness
A technical write-up on integrating Ota into Supabase, keeping the upstream PR lean, and using a full pressure branch to expose and fix real Ota platform gaps.
Engineering note2026-05-19
Pressure Testing Ota on n8n: A Closed PR That Still Proved the Point
I ran a real pressure test on one of the most visible OSS automation repos: n8n-io/n8n. PR:...